EMERGENCY WORKS AT HIGHCLIFFE AND GUNDIMORE BEACHES

Christchurch and East Dorset Council

Client

£16K

Value

This Contract Included:

  • Reinstate leisure track and reposition rock armour and adjust beach levels at Gundimore Beach
  • Trim and tidy all edging of the vehicular access track at Highcliffe Beach
  • Supply and place 100 tonnes of rock armour as scour protection. A geomembrane installed to prevent wash out offines
  • Beach recycling to reinstate levels to suit all access tracks.