MUDEFORD SANDBANK BEACH RECYCLING AND COAST PROTECTION ASSET REPAIRS

Christchurch & East Dorset Councils

Client

£63K

Value

The Project Details

To access the EBB-Tide Delta, 100m off Mudeford Spitand excavation of approximately 7000m³of existing material.

This Contract Included:

  • Transport, via Volvo articulated dump trucks, to previously identified depleted Groyne Bays and spread as required
  • Clear blown sand from existing promenade along spine of Mudeford Spit and place back into depleted bays
  • Import and place 320t of additional rock armour to strengthen and heighten the seaward facing revetment
  • Replace and repair existing Groyne markers