DP WORLD PAVEMENT WORKS

DP WORLD (SOUTHAMPTON) LTD

Client

£8M

Value

The Project Details

Removal & replacement of 65000m2 of reinforced concrete paving within the container terminal at southampton docks. This is phased project running from 2013 – 2020.

This Contract Included:

  • Breaking out & disposal of pre cast stelcon pavement
  • Replacement with cast insitu concrete slabs
  • Works carried out in an operational container port
  • Programme of works planned to minimise disruption to container operations with close client liaison