CRANE RAIL SCT3-4 DRAINAGE AND CRANE RAIL

DP WORLD

Client

£700K

Value

The Project Details

Reconstruction of existing crane rail and replace drainage.

This Contract Included:

  • Removal of 501m of existing bar drainage and replace with new cast insitu slot drainage
  • Supply and installation of new class 1 bypass interceptor with new penstocks and quay outfall
  • Removal of 375m of existing crane rail and existing timbers/ fixings. Construct new concrete foundation and refix existing rail with new sole plates and fixings and reinstate rubber crumb surfacing
  • Working within a live container terminal. Working closely with port operations to accommodate ship movements