Reconstruction of existing crane rail and replace drainage.
This Contract Included:
Removal of 501m of existing bar drainage and replace with new cast insitu slot drainage
Supply and installation of new class 1 bypass interceptor with new penstocks and quay outfall
Removal of 375m of existing crane rail and existing timbers/ fixings. Construct new concrete foundation and refix existing rail with new sole plates and fixings and reinstate rubber crumb surfacing
Working within a live container terminal. Working closely with port operations to accommodate ship movements